Solar and battery backup in Lebanon: sizing and costs
A fibre terminal and router need only about 20 watts, so keeping the internet on through Lebanon's power cuts costs far less than most people think. This guide shows the sizing arithmetic for homes and small offices, compares backup options and explains the rules.
Last updated: November 2026
To keep a home internet connection alive through Lebanon’s power cuts, a fibre terminal and router need only about 20 watts, so a small DC UPS or a portable power station with 150 to 300 watt-hours of LiFePO4 storage will cover most outages. A home office with laptops needs roughly 1.5 to 2 kWh of battery and a 1 kVA inverter, and a small office running all day usually needs a hybrid solar system with 5 to 10 kWh of storage. This guide shows the arithmetic, compares the options and lists what to check before you pay an installer.
Why backup power matters for connectivity in Lebanon
Électricité du Liban (EDL) still produces only a few hours of power a day, according to reporting by The National in November 2026. Private neighbourhood generators supplied 50% of the country’s electricity at the start of 2026, against 31% from EDL, the same outlet reported in October 2026.
Generator power is expensive. The Energy Ministry sets the official generator tariff every month. For August 2026 it was LBP 48,241 per kWh (about $0.53) in cities and areas below 700 metres, and LBP 53,065 (about $0.59) in villages and areas above 700 metres, LBCI reported. On top of that come fixed monthly fees of LBP 385,000 for a 5-amp subscription and LBP 685,000 for 10 amps. A household using 150 kWh on a 5-amp line paid about $81 for the month.
Even with a generator subscription, there are gaps: the switchover between EDL and the generator, the hours when the generator is off for rest or maintenance, and the amperage limit that trips the line when too many appliances run. Each gap drops the router and any call in progress; a small battery in between removes them.
Solar has filled much of the gap. Lebanon’s cumulative solar capacity reached 1,505 MW at the end of 2025, up from 1,081 MW a year earlier, according to IRENA figures cited by PV Magazine, and the Lebanese Center for Energy Conservation (LCEC) puts solar at 19% of electricity production in 2026, The National reported.
What home backup cannot fix
Your battery keeps your own equipment running. It does not power the street cabinet or exchange that serves you. In 2021 the head of Ogero warned that continued rationing could cause internet blackouts and said the operator was buying extra diesel generators for relay stations. If your area’s exchange loses power, your router stays on but has no service, and a mobile data hotspot is the practical fallback. If you still rely on an unlicensed neighbourhood provider, check the government’s order to move subscribers to legal networks, since a provider change can also change what equipment sits in your home.
The basic arithmetic
Every backup system is sized with three numbers: how much power your equipment draws, for how long, and how much of the battery you can actually use.
1. Energy needed: watts × hours = watt-hours
Add up the running power of everything you want to keep on, in watts (W), and multiply by the hours of outage you want to cover. The result is energy in watt-hours (Wh). 1,000 Wh is 1 kWh.
Find the watts on the power adapter label. A router adapter marked 12 V and 1.5 A can deliver up to 18 W (volts × amps), but the router usually draws less. A cheap plug-in power meter gives the real figure.
2. Battery capacity: allow for depth of discharge and losses
Batteries should not be emptied completely. Depth of discharge (DoD) is the share of the rated capacity you use in each cycle. A common planning figure is 80 to 90% for LiFePO4 and 50% for lead-acid if you want it to last. Inverters also lose energy converting battery DC to 230 V AC, typically 10 to 15%.
The formula is:
Rated battery capacity (Wh) = energy needed (Wh) ÷ (DoD × inverter efficiency)
To convert to amp-hours, divide by the battery voltage: a 1,280 Wh battery at 12.8 V is 100 Ah.
3. Inverter size: continuous load plus headroom
The inverter must carry the total load at once, with a margin of at least 25%. Motors and compressors (fridges, pumps, air conditioners) draw several times their running power when they start, so they need a much larger inverter. Laser printers and kettles draw short, high peaks and are best left off the backup circuit.
Worked sizing examples
The figures below use typical consumption for each device. Measure your own equipment before buying, because routers and laptops vary widely.
| Scenario | Load | Hours | Energy needed | Battery (LiFePO4, 90% DoD) | Battery (lead-acid, 50% DoD) | Inverter |
|---|---|---|---|---|---|---|
| Internet only: fibre ONT 8 W + Wi-Fi router 12 W | 20 W | 6 | 120 Wh | 150 Wh (12 V, 12 Ah) via DC UPS, about 90% efficient | 270 Wh (12 V, 23 Ah) | None if powered by DC; 300 W if AC |
| Home office: internet 20 W + two laptops 90 W + two LED lights 20 W + phone chargers 10 W | 140 W | 8 | 1,120 Wh | 1,380 Wh, so 1.5 to 2 kWh | 2,490 Wh, so about 2.5 kWh | 500 W to 1 kVA |
| Small office: four laptops 180 W + two desktops with monitors 300 W + network gear 50 W + six LED lights 72 W | about 600 W | 8 | 4,800 Wh | 5,900 Wh, so about 6 kWh | 10,700 Wh, so about 11 kWh | 1.5 to 3 kVA |
How the home office figure is worked out: 140 W × 8 h = 1,120 Wh. Then 1,120 ÷ (0.9 DoD × 0.9 inverter efficiency) = 1,383 Wh. With lead-acid: 1,120 ÷ (0.5 × 0.9) = 2,489 Wh.
For the small office: 600 W × 1.25 headroom = 750 W of continuous inverter capacity. A 1.5 kVA unit covers it, and a 3 kW hybrid inverter leaves room to add solar panels and a few more machines later.
Adding solar to recharge the battery
If EDL and generator hours are not enough to refill the battery every day, panels do the job. One Lebanese retailer’s sizing guide uses roughly 4 to 5 kWh of output per kilowatt-peak (kWp) of panels on a clear day, and less in winter.
For the small office using about 6 kWh a day: 6 ÷ 4 = 1.5 kWp on a clear day. Add a margin for winter, dust and shade and you reach 2 to 3 kWp, which is about four to six panels of 500 to 550 W.
LiFePO4 or lead-acid?
| Feature | LiFePO4 (lithium iron phosphate) | Lead-acid (flooded, AGM, gel, lead-carbon) |
|---|---|---|
| Usable capacity | 80 to 100% of rating | About 50% for a long life |
| Cycle life | Typically quoted in the thousands of cycles | Typically hundreds at deep discharge; lead-carbon does better |
| Weight | Roughly a third to a half for the same usable energy | Heavy; floor loading matters for big banks |
| Upfront cost | Higher | Lower |
| Heat tolerance | Better, but charging must stop at high temperatures | Life drops sharply in hot rooms and on rooftops |
| Maintenance | None; built-in battery management system (BMS) | Flooded types need topping up and ventilation for hydrogen gas |
| Best use | Daily cycling with solar, offices, power stations | Occasional backup on a tight budget |
Because you can use almost twice as much of a LiFePO4 battery, compare prices per usable kWh, not per rated kWh or per amp-hour. A 200 Ah lead-acid battery at 12 V is 2.4 kWh on the label but about 1.2 kWh in practice.
Do not mix old and new batteries, or different chemistries, in one bank.
Options for keeping just the internet on
For most homes the cheapest reliable fix is to power the router and fibre terminal directly from a battery, without converting to 230 V and back.
- DC mini UPS for routers. A small lithium pack with 12 V and 9 V DC outputs (and often 5 V USB) that sits between the router adapter and the router. Check that its output voltage matches each device’s adapter label and that it has enough ports for the ONT and router. It switches over with no interruption.
- Standard computer UPS. Usually a small sealed lead-acid battery behind a 230 V output, designed to give a desktop minutes to shut down safely, not hours of runtime.
- Portable power station. A LiFePO4 battery with AC sockets, DC and USB outputs, recharged from the wall, a car or a folding panel. A 300 to 500 Wh unit runs a router and ONT for a full day and charges laptops. Check that it offers a UPS mode with fast switchover.
- Inverter with battery, no panels. Charges when EDL or the generator is on and powers a few sockets in between. Common in Lebanese homes, and a sensible first step before adding solar.
Comparison of backup approaches
| Approach | What it can run | Typical runtime | How it recharges | Main drawback |
|---|---|---|---|---|
| DC mini UPS | Router and ONT | 4 to 8 hours | From the router’s own adapter | Network gear only |
| Computer UPS (lead-acid) | One PC or network rack | Minutes | Mains | Short runtime, batteries wear quickly |
| Portable power station | Router, laptops, lights | Most of a day at low load | Mains, car or solar panel | Limited output for heavy loads |
| Inverter and battery bank | Selected home or office circuits | Hours, set by bank size | EDL or generator | Depends on grid or generator hours |
| Hybrid solar with LiFePO4 | Most of an office or home except heavy heating and cooling | Day and evening | Panels, plus EDL or generator | Highest upfront cost, roof space needed |
| Generator subscription | Whatever the amperage allows | Set by the operator’s schedule | Not applicable | Monthly cost, gaps at switchover, diesel price swings |
What equipment costs in Lebanon
We found no official or institutional survey of current retail prices for home solar and battery equipment in Lebanon. The figures below are list prices published by Lebanese retailers, checked in November 2026. Treat them as a starting point and get at least two written quotes.
- Ghaddar’s online shop lists a Sungrow 6 kW single-phase hybrid inverter (SH6.0RS) at $1,095, a 10.24 kWh high-voltage LFP battery at $2,800 and a 15.36 kWh battery at $3,900. The shop says these are equipment-only prices: panels, mounting, cabling, protection devices and installation cost extra.
- Active Tech Solutions lists packages from $1,700 (four panels, two 200 Ah batteries and a 3,500 W inverter) to $2,850 (eight panels and four 200 Ah acid batteries), and a Deye 8 kW inverter with a Welion lithium battery from $3,100. The page says packages include delivery and installation, but panel wattage and battery kWh are not listed for every package, so ask before comparing.
To compare quotes fairly, divide the price by usable kWh of storage, and check that the inverter, protection devices and installation are included.
Net metering and the law
Parliament passed Law 318/2023 on distributed renewable energy on 14 December 2023, the LCEC says. The European Bank for Reconstruction and Development (EBRD) supported the Energy Ministry in drafting it. According to an analysis by the Lebanese Center for Policy Studies (LCPS), the law:
- allows net metering, in which consumers exchange their solar electricity with EDL in 12-month cycles and are compensated for a percentage of any surplus left at the end of each cycle;
- lets producers sell power through the public grid under an agreement with EDL and a grid-use fee;
- allows direct sale to end users on an adjacent property without using EDL’s network, which the LCEC describes as peer-to-peer trading through direct power purchase agreements or equipment leasing;
- caps privately owned renewable systems at 10 MW.
Much of the detail is left to the Electricity Regulatory Authority (ERA), which sets eligibility criteria, grid connection procedures and tariffs. The Cabinet appointed the ERA’s board on 11 September 2025, with Marwan Jamal as chair, Business News reported. In July 2026 the ERA launched an expression of interest for up to 350 MW of grid-connected solar with 1 GWh of battery storage, PV Tech reported. We found no published ERA net-metering rules for households as of November 2026, so ask EDL and your installer whether export is possible in your area before counting on it in your sums.
Permits for rooftop systems
In September 2026 the Ministries of Interior and Municipalities, Public Works and Transport, and Energy and Water issued interim rules for solar systems up to 1.5 MW, PV Magazine reported. Under them:
- systems below 1.5 MW do not need Energy Ministry approval, but go through a municipal administrative and safety procedure;
- a structural engineer and an electrical or electromechanical engineer must sign off the project, supervise the installation and confirm on completion that it meets safety requirements;
- approvals are generally valid for one year, and the installation must be finished within that period.
The rules apply until the regulator issues final ones. Ask your municipality what it requires before work starts.
Safety and installer checks
Most solar fires and failures come from poor wiring and protection, not from the panels. Before you sign:
- Check the installer. The LCEC publishes a list of recommended solar PV companies in Lebanon, updated in November 2026. Ask for the names of the engineers who will sign off the work.
- Ask for datasheets and standards. Panels should carry IEC 61215 and IEC 61730 certification, inverters IEC 62109, and lithium batteries IEC 62619. Ask who honours the warranty locally and get it in writing.
- Protection on both sides. The system needs correctly sized DC fuses or breakers between battery and inverter, a DC isolator for the panels, surge protection and proper earthing.
- No backfeeding. The inverter or changeover switch must stop your system from feeding power into EDL or generator lines during an outage. This protects line workers and your equipment.
- Cable size and connectors. Battery cables carry high currents. Undersized cable or mismatched connectors heat up and are a common cause of fires.
- Battery location. Keep batteries out of direct sun, away from bedrooms and escape routes, and in a ventilated space. Flooded lead-acid batteries release hydrogen while charging.
- Roof and wind loads. A structural engineer should confirm the roof can carry the frames and that they are anchored for winter storms.
FAQ
How long will a power bank run my router?
Divide the usable watt-hours by the router’s draw. A power bank rated 20,000 mAh at 3.7 V holds about 74 Wh, of which roughly 60 Wh is usable after conversion losses. At 20 W for a router and ONT, that is about three hours, if the power bank can output the right voltage, usually 12 V, with a suitable cable.
Is a portable power station enough for a home office?
A unit of 1 to 2 kWh will run a router, two laptops and lights through a typical evening outage, but not an air conditioner or water heater. Check the continuous output rating as well as the capacity.
Should I choose LiFePO4 even though it costs more?
For anything that cycles every day, usually yes. You can use most of its capacity, it lasts many more cycles and it needs no maintenance. Lead-acid makes sense mainly for rare, short backup on a tight budget.
Can I sell my surplus solar power to EDL?
Law 318/2023 allows net metering, but the detailed rules are set by the Electricity Regulatory Authority. Check with EDL and your installer about the current position in your area before relying on it.
Will a battery help if the internet goes down across my area?
No. It keeps your own equipment powered, but if the local exchange or street cabinet loses power, you will need a mobile data connection as a fallback.
Sources
- The National: Lebanon cuts electricity to public institutions over unpaid bills (November 2026)
- The National: Lebanon’s power failure, diesel generators and $300-a-month bills (October 2026)
- LBCI: Lebanon generator bills, breaking down the August cost surge (September 2026)
- Developing Telecoms: Blackouts impacting connectivity in Lebanon, warns Ogero boss (June 2021)
- LCEC: Decentralized Renewable Energy Law
- LCPS: Regulating the energy transition, Lebanon’s new law on distributed renewable energy (February 2024)
- Business News: Marwan Jamal to chair Electricity Regulatory Authority (September 2025)
- PV Tech: Lebanon seeks 350MW/1GWh solar and energy storage (July 2026)
- PV Magazine: Lebanon issues new provisions for solar up to 1.5 MW (September 2026)
- LCEC: List of Recommended Solar PV Companies in Lebanon (November 2026)
- Ghaddar: Sungrow inverter prices and sizing guide for Lebanon
- Active Tech Solutions: Solar energy system packages
Spotted an error? Email corrections@itmagazineme.com with the article link.



